Perform a power boiler day shift with an opacity watch
You are a trainee Boiler Operator working under the supervision of the licensed operator.
What has happened
The power boiler is supplying steam to the paper machine and the turbine on a normal production day. Yesterday's opacity peaked at 18 per cent during sootblowing against a licence limit of 20 per cent, and the supervisor wants the sootblowing sequence staggered. A steam leak on a drain valve gland at the turbine end was repaired under permit last week and the work order is complete. During your shift the low water alarm test is due, the water chemistry tests are due, and the feed pump 2 bearing is on the lubrication schedule. Part way through the shift the drum level drops and a low water alarm sounds.
Deliverables
- Start of shift handover and walk-down record
- Hourly readings table
- Written response to the low water alarm
- Operator preventative maintenance checklist and any work order
- Environmental log records and end of shift handover
Documents to use
Systems to use
Production Shift Log
The shift record for each production area covering tonnes made, downtime, quality results, plant status and handover notes.
Environmental Discharge and Emissions Log
The shift record of effluent and stack monitoring results against licence limits, with any exceedance and the action taken.
Maintenance Work Orders
The record of preventative and breakdown maintenance requests, their priority, planning and completion across the mill.
Units of competency
Current on training.gov.au for the Pulp and Paper Manufacturing Industry Training Package as at 10 September 2026.
PPMSTM301Perform steam boiler operationsPPMSTM201Monitor and control boiler operationsPPMPRM201Undertake operator level preventative maintenancePPMPRM202Perform lubricationPPMWHS301Contribute to work health and safety processesQualifications
PPM30121Certificate III in Pulp and Paper OperationsWhat to look for
Evidence guide
Evidence should show the low water response in the correct order with the gauge glass confirmation and a clear trip decision point, opacity kept below 20 per cent with a described control action, and readings recorded hourly. The preventative maintenance record must show lubrication done and the walk-down must find and record at least one defect. The handover should name the abnormal event and its status.