Control effluent and odour hazards over a 48-hour watch
You are the Environmental Officer on a 48-hour monitoring watch.
What has happened
After a pulp line upset the effluent biochemical oxygen demand has risen to 46 against a licence limit of 50, above the internal target of 40. The morning odour patrol recorded a faint odour at the eastern boundary during a light easterly, four days after a recovery boiler total reduced sulphur exceedance that is still under investigation. The HSE Manager has asked you to take charge of environmental monitoring for 48 hours: review the log, increase sampling as the procedure requires, identify and control the sources, prepare a regulator notification in case of an exceedance, and brief her each afternoon. The effluent plant aeration has been increased and the pulp line is recovering.
Deliverables
- Situation summary with likely sources
- 48-hour monitoring plan
- Environmental log records for the watch
- Draft regulator notification
- Two afternoon briefings and the Incident and Hazard Register entry
Documents to use
Systems to use
Environmental Discharge and Emissions Log
The shift record of effluent and stack monitoring results against licence limits, with any exceedance and the action taken.
Incident and Hazard Register
The site register of injuries, near misses, hazards, equipment damage and environmental incidents with their investigation status and corrective actions.
Production Shift Log
The shift record for each production area covering tonnes made, downtime, quality results, plant status and handover notes.
Units of competency
Current on training.gov.au for the Pulp and Paper Manufacturing Industry Training Package as at 10 September 2026.
PPMENV401Monitor and control environmental hazardsPPMENV201Identify and monitor environmental discharges and emissionsPPMWAS401Troubleshoot and rectify water systemsPPMWHS402Identify, assess and control work health and safety risk in own workQualifications
PPM40121Certificate IV in Pulp and Paper OperationsWhat to look for
Evidence guide
Look for correct licence limits and notification timing taken from the documents, a monitoring plan that names people and times, controls that are realistic for an effluent plant and recovery boiler with approvals identified, log records that show status changing as controls take effect, and a notification draft that contains the facts the regulator needs. Briefings should be concise and honest about uncertainty.